WELLINGTON SEWAGE TREATMENT PLANT UPGRADE
The works are being undertaken to improve the operation
of the storm detention pond by providing a return pumping station. A new
effluent outfall pipeline direct to the Macquarie River is to be provided to
avoid release of effluent to the adjacent Bushrangers Creek, which passes
through land used for cattle grazing.
Works include:
- Excavation for the pump station
- Construction of an inlet pipe DN200 DICL from the storm
pond to the inground concrete pump well
- Supply and installation of a DN110 PN16 HDPE rising main
from the pumping station to the existing inlet works
- Supply and installation of an elevated switchboard
platform (above the flood level), a switchboard and associated electrical and
control systems
- Pit on the existing outlet
- Excavation and installation of a 450 mm gravity pipeline
(PE 100 PN16 HDPE) to the Macquarie River via open cut excavation or a
combination of open cut excavation and directional drilling to avoid deep
excavation
- Construction of an outlet structure on the bank of the
river
Budget: $846,510
Estimated completion: April 2020
Contractor: Fewster Brothers Contracting